Island Colony AOAO — 745 Units, On-Time DWV Delivery
The mixed-use condominium resort required intricate pre-construction phase preparation to give the aggressive construction schedule its best chance of success.
The Native Technologies team rose to the challenge by implementing a strategic communications plan, ensuring that all owners were provided at least 6 months' notice prior to in-unit construction. This gave all owners ample opportunity to plan their rental strategies accordingly.
Combined with a series of town hall meetings and detailed project bulletins, the Native Technologies Onsite Construction Manager met with a representative from every unit to document conditions, find solution to challenges, and to provide owner representation at all times.
Joining the project team as the lead design team, Okahara & Associates provided specialized engineering services throughout the project.
SageWater was selected as the contractor for the project and didn't miss a beat, completing every unit on time, 745 times over.
NT was procured by the AOAO in May 2022. The entire project was completed in September of 2024. Delivering large projects on time is our specialty.
RELATED PROJECTS
Topa Financial Center
Topa Financial Center Renovations – Native Technologies provided full construction management services for this $1.1 million renovation in downtown Honolulu. Completed on-time and on-budget for Topa Companies, the project included Canadian granite installation, foundation and stairway repairs, planter waterproofing, exterior lighting and soffit replacement, landscaping, garage resurfacing, and common area painting. General Construction Highlights Location…
Howard Hughes – Ward Center
Native Technologies managed this $3 million renovation for the Howard Hughes Corporation in Kakaʻako. Work included tower cladding, waterproofing, window and fire sprinkler replacements, restroom rebuilds, new lighting, ceilings, canopy replacement, and painting. To keep all stores fully open, construction was strategically staged and performed primarily at night, minimizing disruption for tenants and the public.…
Nuuanu Place AOAO
The Board of Directors at the 20-unit Nuuanu Place turned to Native Technologies to manage their drain, waste and vent pipe (DWV) replacement project. Our design/build project solution was implemented to provide our award-winning services within an affordable budget for the smaller property.
Texaco
Native Technologies was contracted by a mainland organization to provide local presence and manage the rebranding and associated infrastructure and signage modifications at 67 Chevron locations located throughout Hawaii.
From initial site surveys to final punchlists, the Native Technologies team ensured a smooth transition for franchisees and customers alike, as stores remained open for fueling and convenience purchases during the majority of upgrades.