Highlights
Location
Honolulu
Constructed
1979
# of Units
745
Project Value
$11,000,000
Island Colony AOAO — 745 Units, On-Time DWV Delivery
The mixed-use condominium resort required intricate pre-construction phase preparation to give the aggressive construction schedule its best chance of success.
The Native Technologies team rose to the challenge by implementing a strategic communications plan, ensuring that all owners were provided at least 6 months' notice prior to in-unit construction. This gave all owners ample opportunity to plan their rental strategies accordingly.
Combined with a series of town hall meetings and detailed project bulletins, the Native Technologies Onsite Construction Manager met with a representative from every unit to document conditions, find solution to challenges, and to provide owner representation at all times.
Joining the project team as the lead design team, Okahara & Associates provided specialized engineering services throughout the project.
SageWater was selected as the contractor for the project and didn't miss a beat, completing every unit on time, 745 times over.
NT was procured by the AOAO in May 2022. The entire project was completed in September of 2024. Delivering large projects on time is our specialty.
RELATED PROJECTS
Pakalana AOAO
The Board of Directors at the 108-unit leasehold condominium, The Pakalana, procured the professional guidance of Native Technologies for their building-wide DWV replacement project. Our full service design/bid/build package comes with everything required for a successful project, including financing procurement, legal coordination, communications, and of course, construction management.
Iolani Court Plaza AOAO
Native Technologies managed a concrete spall repair, painting, waterproofing, and sealant replacement project completed in 2022, and is currently overseeing a property-wide DWV pipe replacement scheduled for completion in 2026. At this 347-unit condominium, NT has delivered cost efficiencies, clear communication, and strong community coordination to ensure long-term building performance and resident confidence. DWV Pipe…
Mt Terrace AOAO
The window replacement project at the 126-unit Mt. Terrace condominiums elevated the interior living spaces and the exterior appeal of the building. Native Technologies provided Construction Management Services for the complete replacement of the floor to ceiling wrap-around window system at this landmark location.