Highlights
Location
Honolulu
Constructed
0
Locations
67
Project Value
$,000,000
67 Retail Locations Re-Branded Across the Islands
Completing rebranding from Chevron to Texaco at 67 stores spread across the state, Native Technologies provided Construction Project Management and ensured continued retail operations throughout the rebranding process.
With a vast range of existing building characteristics and structural constraints, the Native Technologies team conducted site surveys and assisted in the procurement of mainland-sourced, long-lead time materials, where the accurate specification of requirements was critical to the successful completion of the re-branding process on-time, at each station location. Our dedication to accuracy and attention to detail ensured all materials arrived correctly specified and ready to install.
It was essential for these high-volume stations to remain active during the re-brand process. Native Technologies coordinated with the contractor and oversaw the implementation of a phased re-brand operation which required a high degree of oversight to ensure customer, employee and contractor safety.
Our Project Management Team includes project managers trained in health & safety protocols to ensure appropriate safety plans are implemented during construction.
RELATED PROJECTS
Topa Financial Center
Topa Financial Center Renovations – Native Technologies provided full construction management services for this $1.1 million renovation in downtown Honolulu. Completed on-time and on-budget for Topa Companies, the project included Canadian granite installation, foundation and stairway repairs, planter waterproofing, exterior lighting and soffit replacement, landscaping, garage resurfacing, and common area painting. General Construction Highlights Location…
Mt Terrace AOAO
The window replacement project at the 126-unit Mt. Terrace condominiums elevated the interior living spaces and the exterior appeal of the building. Native Technologies provided Construction Management Services for the complete replacement of the floor to ceiling wrap-around window system at this landmark location.
Royal Iolani AOAO
With new drain, waste, and vent piping installed throughout 296 units, across two towers with multiple different unit configurations, Royal Iolani residents now enjoy the many benefits of a new plumbing system.
2040 Nuuanu AOAO
Native Technologies managed a property-wide DWV system replacement at 2040 Nuuanu with Coffman Engineers (lead designer) and Hawaii Plumbing Group (prime contractor). We handled planning, design management, bidding, financing procurement, and working with Association counsel/owner loan approval by written consent. Completed in 2025 significantly under budget, the project renewed infrastructure with minimal disruption. DWV Pipe…